Please wait a minute...
 首页  期刊简介 编委会 投稿须知 期刊订阅 联系我们 下载中心 English
 
最新录用  |  当期目录  |  热点文章  |  过刊浏览  |  阅读排行  |  下载排行  |  引用排行
中国油气  2016, Vol. 23 Issue (3): 13-17    
  技术装备 本期目录 | 过刊浏览 | 高级检索 |
Yamal LNG Project and Made-in-China Equipment Going Globally
Li Yulong, Kong Linghao, Liu Jia
LNG Technology Research Center, China Huanqiu Contracting & Engineering Corporation, CNPC
Yamal LNG Project and Made-in-China Equipment Going Globally
Li Yulong, Kong Linghao, Liu Jia
LNG Technology Research Center, China Huanqiu Contracting & Engineering Corporation, CNPC
全文: PDF(1972 KB)  
输出: BibTeX | EndNote (RIS)      
摘要 The Yamal LNG project in the Arctic area of Russia (Yamal LNG) involves many aspects including management of the project's finances, construction of LNG plants and special ships, exploration and development, liquefaction, storage, transportation, and distribution of natural gas. The project is very demanding in terms of quality, standards, and technologies required. China was chosen to carry out modular fabrication for the projects. Six Chinese offshore engineering companies were awarded with contracts to manufacture modules that weigh more than 400,000 tons. Other Chinese companies were also enlisted to provide manufacturing, production, and processing assistance along with material and equipment supplies for the project. Their involvement in the project showed to the world not just their comprehensive strength in both LNG technologies and equipment fabrication but also their potential to become a world class competitor in the petroleum engineering market, as demonstrated by their strong capacity, attractive cost, and short delivery period for module fabrication during their participation in the Yamal LNG project.
服务
把本文推荐给朋友
加入引用管理器
E-mail Alert
RSS
作者相关文章
Li Yulong
Kong Linghao
Liu Jia
关键词 Yamal LNGLNGModularizationChinese technology and equipment    
Abstract:The Yamal LNG project in the Arctic area of Russia (Yamal LNG) involves many aspects including management of the project's finances, construction of LNG plants and special ships, exploration and development, liquefaction, storage, transportation, and distribution of natural gas. The project is very demanding in terms of quality, standards, and technologies required. China was chosen to carry out modular fabrication for the projects. Six Chinese offshore engineering companies were awarded with contracts to manufacture modules that weigh more than 400,000 tons. Other Chinese companies were also enlisted to provide manufacturing, production, and processing assistance along with material and equipment supplies for the project. Their involvement in the project showed to the world not just their comprehensive strength in both LNG technologies and equipment fabrication but also their potential to become a world class competitor in the petroleum engineering market, as demonstrated by their strong capacity, attractive cost, and short delivery period for module fabrication during their participation in the Yamal LNG project.
Key wordsYamal LNG    LNG    Modularization    Chinese technology and equipment
     出版日期: 2016-10-18
引用本文:   
Li Yulong, Kong Linghao, Liu Jia. Yamal LNG Project and Made-in-China Equipment Going Globally[J]. 中国油气, 2016, 23(3): 13-17.
Li Yulong, Kong Linghao, Liu Jia. Yamal LNG Project and Made-in-China Equipment Going Globally. China Oil & Gas, 2016, 23(3): 13-17.
链接本文:  
http://www.coag.com.cn/CN/      或      http://www.coag.com.cn/CN/Y2016/V23/I3/13
[1] Xu Hongfeng, Shi Jiaming. An Overview of SinoRussia Energy Cooperation[J]. Academic Journal of Russian Studies, 2014, 24(6):85-92.
[2] Technology Daily. Energy Pearl within Arctic Circle——a visit to Yamal LNG. 2015.4.21.002.
[3] Ifeng.com. Russia:Yamal LNG breaks new ground for Sino-Russia Cooperation.http://news.ifeng.com/a/20151019/45660933_0.shtml
[4] Ifeng.com.China's first export of domesticmanufactured LNG modules to the North Pole, http://finance.ifeng.com/a/20160409/14313637_0.shtml
[5] Eworldship.com. COOEC Completed two Core Modules for Yamal LNG. http://www.eworldship.com/html/2016/NewShipUnderConstrunction_0503/114755.html
[6] Eworldship.com. CNPC's first LNG module job——Yamal LNG. http://www.cnshipnet.com/news/12/57546.html
[7] Penglai Jutal Offshore Engineering Heavy Industries Co., LTD website. We completed manufacture of Yamal 100-PAR-004 module. http://zh.pjoe.com.cn/pjoeweb/article.php?id=164
[8] Eworldship.com. Qingdao McDermott Wuchuan received Yamal LNG module contract. http://www.cnshipnet.com/news/12/55551.html
[9] Wtoutiao.com. Who participated Yamal LNG. http://www.wtoutiao.com/p/r7csnG.html
[10] Ifeng. UK Media:Russian Energy Project won 12 billion US dollars from China against Western Economic Sanction. http://finance.ifeng.com/a/20160516/14385691_0.shtml
[1] Shan Lei, Sun Hui, Ai Yong. Review of Gas Transportation and Storage Facilities Construction in 2015[J]. 中国油气, 2016, 23(1): 29-35.
[2] Liu Guirong. Opportunities and Challenges of Sino-Australia LNG Cooperation[J]. 中国油气, 2015, 22(4): 60-64.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
版权所有 © 2015 《中国油气》编辑部
本系统由北京玛格泰克科技发展有限公司设计开发 技术支持:support@magtech.com.cn