Please wait a minute...
 首页  期刊简介 编委会 投稿须知 期刊订阅 联系我们 下载中心 English
 
最新录用  |  当期目录  |  热点文章  |  过刊浏览  |  阅读排行  |  下载排行  |  引用排行
中国油气  2015, Vol. 22 Issue (4): 48-54    
  本期目录 | 过刊浏览 | 高级检索 |
Technology and Practice of Stabilizing Oil Production and Controlling Water Cut in Kalamkas Oilfield in Central Asia
Qiu Lin
Research Institute of Exploration and Development, PetroChina Liaohe Oilfield Company
Technology and Practice of Stabilizing Oil Production and Controlling Water Cut in Kalamkas Oilfield in Central Asia
Qiu Lin
Research Institute of Exploration and Development, PetroChina Liaohe Oilfield Company
全文: PDF(429 KB)  
输出: BibTeX | EndNote (RIS)      
摘要 In this paper, by in-depth geological research of Kalamkas Oilfield in Central Asia, the geological body has been re-ascertained; combined with fine study of reservoir engineering, based on the understanding of the distribution of remaining oil, horizontal wells have been given full play to stabilizing oil production and controlling water cut, reducing the producing pressure drop, improving well productivity and other advantages, and the development and deployment has been optimized; horizontal wells have been applied to solve problems such as old well casing damages, shutting down wells, low-productivity and lowefficiency wells, and high water cut wells to improve the utilization rate of old wells; through separate layer system improved injection production pattern, adjustment wells have been optimized and deployed, and part measures wells have been preferably selected to tap the residual oil, improve the degree of reserves control, realize the stabilization of oil production and control of water cut in an old oilfield, and further improve the development effects.
服务
把本文推荐给朋友
加入引用管理器
E-mail Alert
RSS
作者相关文章
Qiu Lin
关键词 Oil production stabilization and water cut controlRemaining oilFlooding pattern improvementHorizontal wellSidetracking horizontal wellCountermeasure    
Abstract:In this paper, by in-depth geological research of Kalamkas Oilfield in Central Asia, the geological body has been re-ascertained; combined with fine study of reservoir engineering, based on the understanding of the distribution of remaining oil, horizontal wells have been given full play to stabilizing oil production and controlling water cut, reducing the producing pressure drop, improving well productivity and other advantages, and the development and deployment has been optimized; horizontal wells have been applied to solve problems such as old well casing damages, shutting down wells, low-productivity and lowefficiency wells, and high water cut wells to improve the utilization rate of old wells; through separate layer system improved injection production pattern, adjustment wells have been optimized and deployed, and part measures wells have been preferably selected to tap the residual oil, improve the degree of reserves control, realize the stabilization of oil production and control of water cut in an old oilfield, and further improve the development effects.
Key wordsOil production stabilization and water cut control    Remaining oil    Flooding pattern improvement    Horizontal well    Sidetracking horizontal well    Countermeasure
     出版日期: 2016-01-19
引用本文:   
Qiu Lin. Technology and Practice of Stabilizing Oil Production and Controlling Water Cut in Kalamkas Oilfield in Central Asia[J]. 中国油气, 2015, 22(4): 48-54.
Qiu Lin. Technology and Practice of Stabilizing Oil Production and Controlling Water Cut in Kalamkas Oilfield in Central Asia. China Oil & Gas, 2015, 22(4): 48-54.
链接本文:  
http://www.coag.com.cn/CN/      或      http://www.coag.com.cn/CN/Y2015/V22/I4/48
[1] Chao Huaqing, Liu Heng, Wan Xinde. The Knowledge and Measure of Stabilizing Oil Productionand- Controlling Water Content in the Late Stage of High Water Cut [J]. Petroleum Geology & Oilfield Development in Daqing, 1993, 23 (2) :33-36.
[2] Song Junling, Li Deru, Qin Ling, et.al. Study on Composite Production Stabilization and Water Cut Controlling Technologies in Xinzhuang Oilfield. Henan Petroleum [J], 2004, 18 (3) : 33-34.
[3] Li Chen, Yang Xiaoli, Guli Zhadan, et.al. Technical Countermeasures for Water Controlling and Oil Stabilization in High Water-containing Exploitation Period of Grit Frame Reservoir-An example of Triassic Reservoir in District 1 of Kelamayi Oilfield [J]. Journal of Xingjiang Petroleum Institute, 2004, 16 (3) :56-59.
[4] Cheng Zhongping, Li Honghai, Zhang Xiuwen. Increasing Discharge Rate and Controlling Water Cut for Water Flooding Oilfield [J]. Fault Block Oil & Gas Field, 1998, 23 (4) : 34-37.
[5] Tan Chengjun, Liu Minggao, Li Hao, Ma Xujie. The Measures for Stable Production and Water Controlling in Carbonate Reservoir-An example of the Reservoir in District A of Tahe Oilfield [J]. Xinjiang Petroleum Geology, 2004, 25 (5) :509-511.
[6] Gao Lijiang. Method Study on Stabilizing Production and Controlling Water in Hainan No.3 Block[J]. Special Oil & Gas Reservoirs, 2004, 11(5):66-68.
[7] Wang Kai, Wei Jinyuan, Wang Hui, et.al. Application and Research on the Technique of Stabling Oil Production by Water Controlling in Yan 9 Reservoir of New No.14 Well Field [J]. Inner Mongolia Petrochemical Industry, 2007, 33 (2) :138-139.
[8] Deng Minmin, Liu Junyan. Comprehensive Treatment on the Matured KARAMAY Conglomerate Reservoir with the Measures of Stabilizing Oil Production and Controlling Water-cut [J]. Oil journal, 1997, 18 (4): 89-94.
No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
版权所有 © 2015 《中国油气》编辑部
本系统由北京玛格泰克科技发展有限公司设计开发 技术支持:support@magtech.com.cn