Study on the Technique of Using Temporary Ballast Tanks for Aided Undocking of Floating Platforms
Dong Yaofeng, Zhang Guanglei
Offshore Oil Engineering Co., ltd
Study on the Technique of Using Temporary Ballast Tanks for Aided Undocking of Floating Platforms
Dong Yaofeng, Zhang Guanglei
Offshore Oil Engineering Co., ltd
全文: PDF(1158 KB)  
输出: BibTeX | EndNote (RIS)      
摘要 It was originally planned that the Liuhua 11-1 Tension Leg Platform(TLP) would be constructed by China Offshore Oil Engineering Co., Ltd. at its dock in Qingdao. After the closure of upper blocks and the completed construction of a lower floating body, it would then be towed out of the dock and set for sail via wet towing. However, due to the insufficient depths of the dock in Qingdao and the fairway, additional temporary buoyancy is required for the safe undocking and sailing of the TLP. In this paper, a technique to provide additional buoyancy by use of temporary ballast tanks positioned on both sides outside the Pontoon of the TLP to reduce its draft was studied. The paper also introduced the design, mounting and offshore removal of the temporary ballast tanks and additional related techniques, which will provide reference for subsequent integral undocking projects relating to floating platforms that require additional temporary buoyancy.
服务
把本文推荐给朋友
加入引用管理器
E-mail Alert
RSS
作者相关文章
Dong Yaofeng
Zhang Guanglei
关键词 Temporary ballast tank (TBT)    
Abstract:It was originally planned that the Liuhua 11-1 Tension Leg Platform(TLP) would be constructed by China Offshore Oil Engineering Co., Ltd. at its dock in Qingdao. After the closure of upper blocks and the completed construction of a lower floating body, it would then be towed out of the dock and set for sail via wet towing. However, due to the insufficient depths of the dock in Qingdao and the fairway, additional temporary buoyancy is required for the safe undocking and sailing of the TLP. In this paper, a technique to provide additional buoyancy by use of temporary ballast tanks positioned on both sides outside the Pontoon of the TLP to reduce its draft was studied. The paper also introduced the design, mounting and offshore removal of the temporary ballast tanks and additional related techniques, which will provide reference for subsequent integral undocking projects relating to floating platforms that require additional temporary buoyancy.
Key wordsTemporary ballast tank (TBT)
     出版日期: 2017-12-19
引用本文:   
Dong Yaofeng, Zhang Guanglei. Study on the Technique of Using Temporary Ballast Tanks for Aided Undocking of Floating Platforms[J]. 中国油气, 2017, 24(4): 39-43.
Dong Yaofeng, Zhang Guanglei. Study on the Technique of Using Temporary Ballast Tanks for Aided Undocking of Floating Platforms. China Oil & Gas, 2017, 24(4): 39-43.
链接本文:  
http://www.coag.com.cn/CN/      或      http://www.coag.com.cn/CN/Y2017/V24/I4/39
No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
版权所有 © 2015 《中国油气》编辑部
本系统由北京玛格泰克科技发展有限公司设计开发 技术支持:support@magtech.com.cn